From: route@monster.com
Sent: Tuesday, April 12, 2016 11:30 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Bunnara Mak 2780 Peggy Sue Lane • Morrow, GA 30260 • Cell:
(770) 356-3664 • bmwellness@hotmail.com
QUALIFICATIONS ·
Experienced
AutoCAD 2D/3D, Autodesk Revit, Inventor 2013- 2014 ·
GIS with
UMap ·
Microstation
v8/SE/J with Georgia DOT Macros ·
Microsoft
Office skills EDUCATION Georgia Piedmont Technical College 2012-2014
·
Associate
DegreeMechanical & Architectural Drafting Dekalb Technical Institute 2010-2012
·
Associate
DegreeAutomotive Technology Southern College of Technology 1993-1994 ·
Core
curriculum DeVry Institute of Technology 1991-1992 ·
Electronics
WORK
EXPERIENCE Belt
Corporation of AmericaCumming, GA5/2015-Present CAD Technician Using AutoCAD and Inventor
to: ·
Design
machine belts ·
Design
grinder to grind the belts ·
Design
spinners and other tools such as anvils, dies, to produce rubber belts NTBMorrow,
GA8/2012 – 3/2015 Automotive Technician ·
Keeps
equipment available for use by inspecting and testing vehicles ·
Diagnostics
and preventive maintenance adjusting controls and systems ·
Engine
tune-ups, replacing filters ,oil changes, tire rotation and changes, wheel
balancing ·
Verifies
vehicle serviceability by conducting test drives URS Corporation Atlanta,
GA 9/2002-
12/2009 CAD
Technician
·
Worked
under the direction of Structural Engineers and Project Managers ·
Operated
GIS to create flood maps for FEMA based on guidelines and specifications ·
Created
preliminary and final bridge plans using Microstation J with GDOT Macros ·
Operated
Microstation J to create roadway design plans ·
Other
duties including but not limited to: o
Deck &
Framing Plans, Details & Section, Beam & Bearing Details o
As-Built
Foundation drawings, and General Notes o
Bar
Reinforcement Plans & Bent Details. Riley, Park, Hayden & Associates Norcross, GA
5/2001-8/2001 CAD Technician ·
Performed
duties under the direction of Project Engineer ·
Operated
Microstation creating preliminary GDOT bridge layouts for overpasses, rivers
and creeks ·
Bridge
Engineering Program sheet creation with GDOT Macros for Georgia DOT GDI Engineering Stone Mountain, GA
7/1999-2/2001 CAD Technician ·
Operated
Microstation SE & AutoCAD 2000 for CATV systems maps ·
Drafting
CATV maps from Lode Data design files. ·
Created
strand & cable maps from walk-out maps for MDU (multi-dwelling units) ·
GIS mapping Thompson Company, Inc. Atlanta, GA 3/1998-7/1999 CAD
Technician
·
Operated
Microstation SE for Retail, Hospitality & Government building design ·
Designed
and created Floor plans & HVAC layout systems Lucent Technologies Atlanta, GA
3/1997-1/1998 CAD Technician ·
Operated
AutoCAD to create layouts for commercial and municipal applications ·
Created
Electrical, alarm, & cables systems and other low-voltage systems design
plans ·
Operated
Allview software for Electrical panel design plan creation ·
Operated
NIM-ER software for database entry duties |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Intermediate |
|
|
|